Failure to make contact will result in the inspector attending and advising that the building be vacated. Three phone call attempts will be made within a 15-minute timeframe. Upon arrival at the site, prior to entering the building, the inspector will be expecting to find the building completely vacant. At the inspector’s discretion, the site contact will be advised to ensure that ALL persons in the building (including attached garages) are to vacate. Where do I send revisions or additional information for building permit applications?įor new residential (single/semi/townhouses) erects, inspectors, at their discretion, may call the site contact number to indicate an approximate time of arrival. retaining walls exceeding 1 metre (3 ft.- 3 inches) in exposed height adjacent to public property, to an access to a building, or on private property to which the public is admitted.installation and repairs to sewage systems (septic systems and holding tanks).installation or replacement of storm and sanitary sewers, water service (catch basins, weeping tile, clean-outs, change from septic system to sewers).plumbing installation and alterations, except replacement of fixtures.installations and major alterations of sprinkler, standpipe, fire alarm or mechanical (HVAC) systems.additions to any building having a combined area of 10m 2 (108 sq.fire and water damage affecting interior renovations within a floor area affecting fire separations, exits or structural capacity.interior finishing of shell buildings for tenants (occupancies in commercial or industrial malls and office buildings, etc.).interior renovations within a floor area affecting fire separations, exits or structural capacity.change of use (where construction is proposed or the change constitutes an increase in the hazard index).Projects that do not require a building permit backflow preventers for lawn irrigation systems.installation or repair of private sewer systems and water service.new or structural alterations to windows or doors.insulating exterior walls when exterior or interior cladding is removed.plumbing and/or drains (except replacing fixtures).conversion from septic to sanitary sewer.finishing a basement or a portion thereof.installation, repair of storm, sanitary and water service.carports, attached or detached garages, sheds.basement or main floor walkout alterations.adding or removing most walls, (creating different room sizes and/or uses).decks attached to a building regardless of height.Examples of residential construction that requires a permit *Note: Contact the Electrical Safety Authority (ESA) for electrical permit information. any alterations to an existing building which affect the structural design of the building including mechanical, electrical*, plumbing services (no limit on size of building), fire separations, egress (exits), fire protection/suppression systems and/or changing the use of buildings or parts of a building."designated" structures as per the Ontario Building Code (Division A-1.3.1.1). ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |